Weekly NYC MEP permits
Big NYC MEP permits: week of October 19 – October 25, 2026
65 jobs pulled mechanical, sprinkler, standpipe, boiler or plumbing permits with a declared cost over $500k ($103M in total). Another 74 jobs filed new MEP work that's still in design. Here are the 10 largest permitted jobs.
| Address | Declared cost | Permits | GC / owner | Scope |
|---|---|---|---|---|
| 2 PENN PLAZA, Manhattan | $9,544,000 | Mechanical Systems | JT MAGEN & COMPANY INC VORNADO REALTY TRUST | Hereby filing to install mechanical units with associated ductwork and piping for lobby and office fit out as shown on plans filed herewith. No change to use, occupancy or egress. |
| 32-02 QUEENS BOULEVARD, Queens | $7,173,179 | Mechanical Systems | WESBUILT CONSTRUCTION MAN CBRE | Mechanical modifications taking place on floors 1-5 as per plans filed herewith. No change in use, egress or occupancy |
| 64 ESSEX STREET, Manhattan | $6,130,268 | Mechanical Systems, Plumbing | NEPTUNE MECHANICAL INC NEW YORK CITY HOUSING AUTHORITY | PLUMBING WORK FIR AN EXISTING BUILDING, SCOPE IS LIMITED TO THE REPLACEMENT OF GAS, SANITARY, STORM & WATER RISERS PIPING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| 11 PENNSYLVANIA PLAZA, Manhattan | $4,390,795 | Mechanical Systems | STRUCTURE TONE, LLC VORNADO REALTY TRUST | MECHANICAL MODIFICATIONS TAKING PLACE ON THE 15TH AND 16TH FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 147-01 15 DRIVE, Queens | $4,000,000 | Boiler Equipment | CHAMPION COMBUSTION CORP NYC SCHOOL CONSTRUCTION AUTHORITY | REPLACEMENT OF OIL FIRED HEATING PLANT WITH NEW OIL FIRED HEATING PLANT INCLUDING REMOVAL OF EXISTING EQUIP. |
| 89 DEKALB AVENUE, Brooklyn | $3,550,000 | Mechanical Systems | WITH PRIDE AIR CONDITIONI LONG ISLAND UNIVERSITY | Alt. MS filed subsequently with the alt. GC application. Modify existing and install new HVAC components. |
| 410 EAST 105 STREET, Manhattan | $3,483,190 | Mechanical Systems | AWL INDUSTRIES INC NYCHA | NYCHA EAST RIVER BOILERS CONSISTING OF MECHANICAL WORK FOR BOILER REPLACEMENTS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 56-45 MAIN STREET, Queens | $3,000,000 | Mechanical Systems | CONSIGLI CONSTRUCTION CO NEW YORK PRESBYTERIAN | FIT OUT_INFUSION 6TH, 7TH, 8TH FLOORS AND ROOF - MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| 373 HERZL STREET, Brooklyn | $2,999,625 | Sprinklers | METFLOW FIRE CONTROL LLC EXPRESS BUILDERS JB INC | SPRINKLER SYSTEM FILED IN CONJNCTION WITH ALT CO JOB NUMBER B01246769-I1. |
| 1372 BROADWAY, Manhattan | $2,285,000 | Mechanical Systems | CLUNE CONSTRUCTION CO LP ROSS DRESS FOR LESS | MECHANICAL MODIFICATIONS TAKING PLACE ON CEL, 1ST & 14TH FL ROOF BULKHEAD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
Get the whole list
Every job, with filing details, engineer of record and expediter, as a PDF and spreadsheet every Monday.
Bidding one of these?
The estimating desk for MEP subs: a priced, checked bid in 48 hours, or it's free.
Source: NYC Department of Buildings public filings and permits (DOB NOW). Declared costs are the filer's estimate. Business names only.