Week of Oct 5 – Oct 11, 2026. 67 jobs permitted ($124M declared) and 58 new filings. Full sheet below, free.
Download PDFDownload spreadsheetGet it every Monday for $99/mo| Address | Declared cost | GC / owner | Scope |
|---|---|---|---|
| 695 PARK AVENUE, Manhattan | $14,000,000 | INFINITY CONTRACTING SERV CITY UNIVERSITY OF NEW YORK | DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AIR HANDLING UNITS, FAN COIL UNITS, FANS. |
| 29-10 THOMSON AVENUE, Queens | $16,000,000 | JRM CONSTRUCTION MGMT LLC CUNY | Provide new AHUs for each floor and associate duct work and VAV boxes. Provide dedicated kitchen exhaust and make-up air for the culinary lab. All plans filed as herewith. |
| 2900 GOULDEN AVENUE, Bronx | $7,154,000 | KORDUN CONSTRUCTION CORP DASNY | Replacement of air handler units and associated duct work at existing CUNY Library Lehman College Shuster Hall |
| 200 EASTERN PARKWAY, Brooklyn | $3,000,000 | DYNAMIC US, INC BROOKLYN MUSEUM | APPLICATION IS FILED FOR MECHANICAL/ARCHITECTURAL WORK ASSOCITED WITH THE INSTALLATION OF THE HYDRONIC DISTRIBUTION PIPING FROM CELLAR TO ALL FLOORS AT BROOKLYN MUSEUM, IT WILL BE |
| 65-10 DIETERLE CRESCENT, Queens | $2,888,886 | MAR-SAL PLBG & HTG, INC NYC SCHOOL CONSTRUCTION | Q174- REPLACE ROOF DRAINS,FLOOR DRAINS & STORM PIPING WITH NEW. REPLACING SUMP PUMP WITH NEW. REMOVE EXISTING HW TANK, GAS PIPING, BOOSTER HEATER & ALL ITS APPURTENANCES. RELOCATE |
| 36-01 35 AVENUE, Queens | $2,495,000 | JOHNSON CONTROLS INC THE MUSEUM OF MOVING IMAGE | MECHANICAL UPGRADES AND CHILLER REPLACEMENT ON ROOF AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| 3031 MIDDLETOWN ROAD, Bronx | $4,922,500 | NEPTUNE MECHANICAL INC NEW YORK CITY HOUSING AUTHORITY | INTERIOR RENOVATION OF 18-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FXITURES ON EXISTING ROUGH-IN. NO CHANGE |
| 245 WEST 55 STREET, Manhattan | $2,900,000 | G.N.T. MECHANICAL LLC MADIGAN DEVELOPMENT, LLC | modification to sprinkler/ standpipe system as per plans filed herewith. |
| 1 PENN PLAZA, Manhattan | $2,849,000 | FRESH MEADOW MECHANICAL C VORNADO REALTY TRUST | Demolition of existing steam chiller, and associated piping and accessories throughout the level 12 MER. Steam chiller 2 and piping distribution shall be replaced with new water so |
| 809 MADISON AVENUE, Manhattan | $2,114,000 | CM AND ASSOCIATES CONST Macklowe Properties | DevHUB Consultation 7.18.2025 @2pm. Application filed for mechanical work associated with horizontal and vertical enlargement. |
| 29 9 AVENUE, Manhattan | $2,100,010 | WESBUILT CONSTRUCTION MAN MIDTOWN EQUITIES | Modification of mechanical on 3rd and 4th floor as per plans. No change in use, egress or occupancy. |
| 60 LAFAYETTE STREET, Manhattan | $2,065,531 | TEDCO GROUP INC NEW YORK CITY DEPARTMENT OF DESIGN | Manhattan Family Court - Mechanical work on the sub-cellar, cellar, 1st mezzanine, 1st thru 12th floor as indicated on drawings. |
Source: NYC Department of Buildings public filings and permits. Declared costs are the filer's estimate. Business names only.